中文  /  EN

imgboxbg
img
Current location:
Homepage
/
/
/
Single warehouse Fanghan

Product

Let's help you

Latest news

1/1
[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[Number of views, Number of views]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]:
1000

Single warehouse Fanghan


How to use the prefabricated square culvert mold: brush a layer of oil or release agent in the prefabricated square culvert mold, then pour the mixed cement or concrete into the prefabricated square culvert mold, vibrate with a vibrating rod to remove air bubbles in the cement, It takes about 24 hours for concrete to set and demould at the initial stage. The requirements of large-scale engineering construction in modern society for molds: mold accuracy and smoothness are required to be high; the contact surface with concrete should use a smoothness of 1.6 or more, and the upper plate; the socket surface should be milled as a whole; after manufacturing, stress treatment to prevent deformation; mold The rigidity requirements of the concrete are determined by the working performance of the concrete and the auxiliary vibration force, and the design should be calculated according to the molding method before manufacturing.

[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[Number of views, Number of views]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]:
1000
编号
[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[Quantity, Quantity]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]
-
+
1
Description

How to use the prefabricated square culvert mold: brush a layer of oil or release agent in the prefabricated square culvert mold, then pour the mixed cement or concrete into the prefabricated square culvert mold, vibrate with a vibrating rod to remove air bubbles in the cement, It takes about 24 hours for concrete to set and demould at the initial stage. The requirements of large-scale engineering construction in modern society for molds: mold accuracy and smoothness are required to be high; the contact surface with concrete should use a smoothness of 1.6 or more, and the upper plate; the socket surface should be milled as a whole; after manufacturing, stress treatment to prevent deformation; mold The rigidity requirements of the concrete are determined by the working performance of the concrete and the auxiliary vibration force, and the design should be calculated according to the molding method before manufacturing.

key word:
single
the
to
mold
concrete
and
of
should
in
square
[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[[We could not find any corresponding parameters, please add them to the properties table, We could not find any corresponding parameters, please add them to the properties table]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]

Product recommendation

Online

Username used for comment:
客户留言
Description:
验证码

Hotline:

400-018-7799

Chairman & general manager: Zhang Yong

Mobile: (0)18905258986

Tel: +86-514-86501440

Fax: +86-514-86502418

Chairman & general manager: Zhang Yong

Mobile: (0)18905258986

Tel: +86-514-86501440

Fax: +86-514-86502418

Address: No. 16, Renmin South Road, dinghuo Town, Jiangdu District, Yangzhou City, Jiangsu Province

Postal Code: 225266

底部版权

Time of issue:2019-08-05 00:00:00
Copyright:Jiangsu huaguang shuangshun group  Powered by www.300.cn SEO  |  苏ICP备2021015474号-1

About us     |     Service     |     Join us     |     Contact